The State - News from April 5, 1987
- Share via
Design standards for the proposed new Superconducting Super Collider call for a much larger facility than designers previously had estimated, and may affect California’s bid in the contest among several states to host the multibillion-dollar atom smasher. Federal standards for the machine, essentially a 54.4-mile-long underground tunnel, call for at least 15,830 acres of surface land and underground easements--about double earlier estimates. Also included are other conditions that may affect California’s bid, such as vibration limits. The proposed site east of Stockton includes a railroad line. William Baker, chairman of the California executive steering committee for the project, did not speculate whether the standards would seriously affect the state’s bid for the facility, but said that technical experts from the state’s top universities will be reviewing the standards more closely “to determine if plans for a California site would be further affected.”
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.