Street-widening project narrowly focused, some say
- Share via
Deirdre Newman
An environmental report on the potential widening of Newport
Boulevard says the project will have minimal negative effect on the
entrance to the city, but some residents feel the project will not
accomplish the touted benefits.
The proposed project calls for improving the traffic and
pedestrian conditions on Newport Boulevard from 17th to 19th streets
by adding a fourth northbound lane throughout the area and adding a
fourth southbound lane from the end of the Costa Mesa Freeway to the
intersection with Broadway.
In November, the Downtown and Eastside Transportation Ad Hoc
Committee gave its blessing to the widening, although many committee
members had mixed feelings about the project. Tonight, an open house
will be held for residents to comment on the project and the
environmental report.
The report says two on-street parking spaces will be lost with the
widening, and nearby residential neighborhoods might see more traffic
during construction, which will be about five to six months, project
manager Dave Sorge said. In addition to improving traffic, other
pluses promised by the city are decreasing the number of accidents
and promoting a manageable downtown area.
Some residents, like Tom Egan, who was on the ad hoc committee and
is a Newport-Mesa Unified School District board member, said the
project will be a waste of time and money.
“The project would not improve traffic much, but it would cost a
lot of money and deteriorate our downtown,” Egan said.
The prospect of widening Newport Boulevard has been controversial
in the past because some merchants in the area are concerned it will
add to the area’s congestion, thereby deterring shoppers from
frequenting the shops.
Tom Sutro, who was chairman of the committee and is on the board
of directors of the Chamber of Commerce, said better circulation in
the project area will mean more customers.
“Nobody ever likes more traffic, but I feel that widening that
particular area will benefit those people that are just trying to get
from the 55 freeway down to Pacific Coast Highway,” Sutro said.
“It’ll move the traffic quicker, which in turn allows those residents
and people that want to shop at those businesses better access
quicker.”
Egan took issue with some of the other promised benefits of the
widening. While one of them is decreasing delays in the project area,
Egan said the amount of time saved in 2025 would only be one minute
and 47 seconds in the morning and one minute and nine seconds in the
evening. And Egan said the widening would not decrease the number of
accidents because most are from people running red lights, and the
data in the report was collected before red-light cameras were
installed.
Data for the accident rates was culled from April 1999 to 2002,
and the red-light cameras were installed downtown in October 2003.
* DEIRDRE NEWMAN covers Costa Mesa. She may be reached at (949)
574-4221 or by e-mail at [email protected].
All the latest on Orange County from Orange County.
Get our free TimesOC newsletter.
You may occasionally receive promotional content from the Daily Pilot.